Define the package
Record drawings, revisions, work boundaries and tender clarifications.
A practical workflow for building, extension and refurbishment estimates using your measurements, quotations and stated assumptions.
Identify the drawings, specifications and revisions being used. Separate the work package from adjoining or retained work. For an extension or refurbishment, make strip-out, protection, preparation and making good visible rather than assuming they sit inside a material rate.
Record the measurement unit before applying prices. A slab area needs thickness before becoming concrete volume. A tile area needs actual box coverage before becoming a purchase quantity.
Keep the supplier quotation source, date and service boundary beside the rate. Use assumptions that match the actual site and work sequence, rather than treating one project’s rate as a UK-wide figure.
Open a TB sample estimateRecord drawings, revisions, work boundaries and tender clarifications.
Keep dimensions, units, deductions and allowance separate.
Check the product, commercial pack, delivery and handling basis.
Show included work, exclusions and unresolved assumptions.
Measured dimensions describe the work. Allowances, commercial pack rounding and included services are separate planning or commercial decisions. Make each visible so revisions can be traced to the input that changed.
Check whether materials, labour, equipment, access, preparation, delivery and tax are included or excluded. Resolve uncertain tender scope with the responsible parties before a commitment.
These tools support quantity and planning calculations. They do not establish design suitability, approval or compliance, interpret a contract or certify an entitlement. Use approved documents and the responsible professionals.
Explore quantities, editable rates and resource planning in TrendyBuilders. Choose the working capacity that suits your estimating process.