Define the measured work
Keep drawings, revisions, dimensions and deductions visible. Separate new work from existing-work assumptions.
Prepare extension, refurbishment and building estimates with visible metric quantities, editable GBP examples and clear procurement assumptions.
Metric quantities · Editable rates · Purchase planning · Print-ready reports
EDITORIAL IMAGE · BUILDING IN THE UNITED KINGDOM10 m × 8 m × 0.15 m + 5%
A measured quantity, a supply-only price and a complete installed package have different boundaries.
Keep drawings, revisions, dimensions and deductions visible. Separate new work from existing-work assumptions.
Check materials, labour, preparation, plant and delivery before comparing quotations.
Review allowance, whole units and commercial packs before turning a work quantity into an order.
Three browser-local demos with metric quantities and editable GBP example rates. No account needed.
Adjust the dimensions, allowance and example rate. Review the formula behind the result.
This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.
The total is easier to discuss when its basis can be checked. Show what was measured, which rate was used and which work remains outside the figure.
A practical sequence for scope, quantity, procurement and review.
Record drawings, revisions, work boundaries and tender clarifications.
Keep dimensions, units, deductions and allowance separate.
Check the product, commercial pack, delivery and handling basis.
Show included work, exclusions and unresolved assumptions.
Separate geometric concrete volume, planning allowance and the wider extension package.
Read the guideKeep drawings, clarifications, exclusions and preparation work alongside the tender price.
Read the guideReview allowances, whole units, packaging and delivery before treating a quantity as an order.
Read the guideChoose an individual workspace or greater capacity for a connected team.
A personal workspace for your estimating work.
A connected workflow for an estimating team.
More capacity for a larger operation.
Subscription prices are stated in USD on the main TB platform. Review current prices, capacity, billing period, automatic renewal terms and the final checkout total before subscribing. GBP figures here are illustrative construction-material examples.
It introduces TB’s construction quantity calculations, material purchase planning, editable cost estimates and resource scenarios using metric dimensions and illustrative GBP examples. The guides focus on extensions, refurbishment, tender inclusions and procurement packages.
No. The demo rates are explanatory inputs, not national averages, published price-book rates or supplier quotations. Replace them with dated offers for your location, specification, quantity and supply conditions.
No. Different work items use different measurements and scope boundaries. A slab needs thickness as well as area, a finish needs the actual surfaces, and other work packages need their own review.
Make them explicit, keep the source documents and revisions visible, and resolve uncertainty with the responsible project parties. The tool does not decide contractual entitlement or confirm that a tender covers the required scope.
Explore quantities, editable rates and resource planning in TrendyBuilders. Choose the working capacity that suits your estimating process.